Erie Fire Station No. 15

10 vertical 4½-inch micropiles, drilled to depths up to 32 feet and load tested to 60 kips, to support the structural slabs at Mountain View Fire Rescue's Fire Station No. 15 in Erie, Colorado.

The project

Erie Fire Station No. 15

Mountain View Fire Rescue's Fire Station No. 15 in Erie needed a deep foundation to support its structural slabs.

General contractor Fransen Pittman selected Park Range Construction to install the micropile foundation. Our crew installed 10 vertical micropiles, 4½ inches in diameter, to depths of up to 32 feet, and tied them into new concrete pile caps and grade beams.

Two of the piles were drilled with a man-portable rig and the rest with a skid-steer-mounted rig. Capacity was verified with load testing to 60 kips, for a factor of safety of 2.

Scope of work

  • 10 vertical 4½-inch micropiles drilled to depths up to 32 ft
  • 2 piles drilled with a man-portable rig
  • Remaining piles drilled with a skid-steer-mounted rig
  • Load tested to 60 kips for a factor of safety of 2